MALEY / INDUSTRIES
MANUFACTURING
Wooster, Ohio • maleyindustries.com
MALEY / INDUSTRIES
MANUFACTURING
NO UNIVERSAL TIMETABLE
Production schedules and soil loads vary by facility.
01
Offices, reception and meeting spaces.
02
Breakrooms, restrooms, locker rooms.
03
Shared walkways, entry corridors and dock approaches.
01 / 07
MALEY / INDUSTRIES
MANUFACTURING
ZONE-BASED FREQUENCY
Every service day
High-use restrooms, breakrooms and trash points are common priorities.
Several times per week
Active corridors, floor lanes and entrances may need repeat attention.
Periodic rotation
Deeper restroom work, floor scrubbing and detailed dust removal as needed.
02 / 07
MALEY / INDUSTRIES
MANUFACTURING
WHAT CHANGES THE SCHEDULE
01
Shift size affects shared spaces and waste volumes.
02
Dock activity, packaging debris and dust change cleaning loads.
03
Moisture and winter salt affect entries and traffic zones.
03 / 07
MALEY / INDUSTRIES
MANUFACTURING
04 / 07
COORDINATE WITH PRODUCTION
1
Map shift start and end times.
2
Identify safe windows for accessible-area cleaning.
3
Separate routine cleaning from restricted production tasks.
4
Review recurring trouble spots after a few weeks.
MALEY / INDUSTRIES
MANUFACTURING
SCOPE BOUNDARY
Restrooms, offices, breakrooms, floors, non-restricted shared spaces, and entry zones.
Machinery interiors, hazardous material cleanup, process-line cleaning and decontamination require separate qualifications and scope.
05 / 07
MALEY / INDUSTRIES
MANUFACTURING
NEXT STEP
START WITH YOUR BUILDING
maleyindustries.com/quote
06 / 07